06 December,2018 07:40 PM IST | Mumbai | Rajendra B. Aklekar
Part of the Metro's elevated corridor is being developed on the lines of Howrah Bridge
Part of the Navi Mumbai Metro's elevated corridor from Nilje to Kalamboli will look like a replica of Kolkata's iconic Howrah Bridge after the structure gets completely fixed in the next couple of days. With this, the project will also inch closer to completion, as trains for it are scheduled to arrive next month. Central Railway sources said trains would be stopped between 9.50am and 12.50pm today for fixing the cage-like structure.
Deepak Hartalkar, superintending engineer, Navi Mumbai Metro, said, "Work on the elevated corridor is almost complete, 68 per cent of the stations are ready and 50 per cent work on the signal system is complete. Once we finish work on the elevated corridor and tracks, trial runs will start. Then we will approach the Commissioner of Metro Rail Safety for clearances." Sources said the Metro would be opened up around March 2020.
The Navi Mumbai Metro project has been divided into four phases. The first one, which approximately costs R3063.63 crore, starts from Belapur railway station and continues till Pendhar. The second phase stretches from Khandeshwar to Taloja MIDC. The third phase will connect Pendhar and Taloja MIDC and the fourth one will provide connectivity between Khandeshwar and Navi Mumbai Airport near Panvel.
Also Read: Navi Mumbai: NMMT Bus Rams Into Empty Train At Sanpada, 3 Hurt
ALSO READ
Fire destroys three godowns in Navi Mumbai; no casualties
43-year-old finds relief from avascular necrosis with hip replacement surgery
Undeterred by accident, tourists still flocking to Elephanta island
Navi Mumbai man escapes from police custody after tenants’ arrest in drugs case
Navi Mumbai Metro gets ISO certifications for quality, environment and safety
Catch up on all the latest Crime, National, International and Hatke news here. Also download the new mid-day Android and iOS apps to get latest updates