14 December,2024 12:25 PM IST | Mumbai | Rajendra B. Aklekar
Representational Image
Services on all lines of Central Railway were delayed for over 30 minutes as all trains came to a standstill following a major power failure due to a snag in Tata's Netivali power plant near Dombivli on Saturday morning.
On the Pune section, there was a power failure on both up and down lines between Shivaji Nagar and Malavli from 6:09 am - 6:12 am & 6:28 am from Dehu Road-Shelarwadi, Talegaon-Kamshet section, restored at 6:58 am.
On the Nashik section, there was a power failure at Bhusawal, Igatpuri from 6:15 am to 7 am.
On the Kalyan-Lonavala section on up and down lines between 6.05 am to 6.55 am and Kalyan-Igatpuri up and down lines from 6.08 am to 7.08 am.
ALSO READ
Central Railway to operate mega block on Sunday, check details
Mumbai local train updates: WR to operate 5-hour block between Andheri, Borivali
Snag in Mumbai local train at CSMT affects harbour line services
Mumbai: 83 per cent of iron beam has reached Carnac bridge project site
CR to run 48 special trains between Mumbai, Karmali, Kochuveli, Pune
"Following the parting of conductor at the Tata's Netivali transmission plant, power supply to Central Railway's various sections, including Nashik line, Pune line and also at Kalyan was interrupted for about 30 minutes," Central Railway's chief public relations officer Dr Swapnil Nila said.