IN PHOTOS: Dr Babasaheb Ambedkar memorial's work underway at Indu Mill Compound in Mumbai

Covering 4.84 hectares of land acquired from the Union textile ministry, the memorial includes a research center with lecture halls, a library, and facilities for seminars and workshops. Pics/Atul Kamble

Updated On: 2023-11-30 08:20 PM IST

Compiled by : Asif Ali Sayed

Originally proposed in 1989, persistent demands led to government approval in 2011, and construction commenced in February 2018 at the Indu Mills compound. Pics/Atul Kamble

The complex will also feature a museum gallery, restaurant, two parking levels accommodating over 450 vehicles, and an auditorium with over a 1,000-seat capacity

The work completion date is expected to be announced soon and it is expected to open for public by next year

The aesthetically designed complex boasts a seafront promenade providing scenic views of Mahim Bay and the Bandra-Worli Sea Link

With plans for green building certification, over two-thirds of the space is likely to be dedicated to greenery

The statue of Dr Babasaheb Ambedkar will stand at an impressive height of 350 ft on a monument reaching 450 ft from the ground level

The complex includes a meditation area, anticipating high visitor footfall, and aims to provide space for vipashana sessions

Next Gallery

Navy Day 2024 celebrations: Breathtaking stunts leave Mumbaikars spellbound

Related Photos